Call Number |
Title |
Author |
Date |
I 27.2/2:H78/DOC | Colorado-Big Thompson Project, Colorado: Geological Report on Horsetooth Reservoir | R.L. Heaton | 2/9/43 |
I 27. 37:73/DOC | Report of Laboratory Tests on Embankment Materials: Horsetooth Reservoir Dams, Colorado Big Thompson Project, Colorado | W.G. Holtz | 6/19/45 |
I27. 37:137/DOC | Laboratory Report of Tests on The Foundation Material From The Cutoff Trench of Horsetooth Dam, Colorado-Big Thompson Project, Colorado | H.J. Gibbs | 4/9/47 |
I27.37:152 /DOC | Laboratory Tests for Determination Of the Placement Moisture Control Limits of Embankment Materials for The Horsetooth Reservoir Dams, Colorado-Big Thompson Project, Colorado | H.J. Gibbs | 11/10/47 |
I27.2/2:H78/2/DOC | Final Construction Report on Spring Canyon Dam of Horsetooth Reservoir, Colorado-Big Thompson Project, Colorado | A.M. McClure | 5/6/49 |
I27.2/2:H78/3/DOC | Final Construction Report on Dixon Dam of Horsetooth Reservoir, Colorado-Big Thompson Project, Colorado | H.B. Field G.E. Hill |
6/20/49 |
I27.2/2:H78/4/DOC | Final Construction Report on Soldier Canyon Dam of Horsetooth Reservoir, Colorado-Big Thompson Project, Colorado | T.B. Thomas | 9/1/49 |
I27.2/2:H78/5/DOC | Final Construction Report on Horsetooth Dam of Horsetooth Reservoir, Colorado-Big THompson Project, Colorado | R.B. Collins T.B. Thomas |
5/1/50 |
I27.2/2:H78/6/DOC | Final Construction Report on Horsetooth Reservoir, Colorado-Big Thompson Project, Colorado | C.A. Hagelin | 6/1/50 |
I27.2/2:H78/7/DRAFT/DOC | Environmental Assessment for Dam Modifications at Horsetooth Reservoir : Draft | South Platte Projects Office | 11/83 |
I27.2/2:H78/7/ FINAL/DOC |
Final Environmental Assessment for Dam Modifications at Horsetooth Reservoir | South Platte Projects Office | 1/84 |
I27.2/2:H78/8/ DRAFT/DOC |
Draft Environmental Assessment for Dam Modifications at Horsetooth Reservoir | Eastern Colorado Projects Office | 10/87 |
I27.2/2:H78/8/ FINAL/DOC |
Final Environmental Assessment for Dam Modifications at Horsetooth Reservoir | Eastern ColoradoProjects Office | 12/87 |
I27.2/2:H78/9/DOC | Horsetooth Reservoir Dams Modification, Colorado-Big Thompson Project, Colorado (Solicitation/Specifications 8-SI-60-02850/DC-7734) | Bureau of Reclamation | 1986? |
I27.2/2:H78/10/DOC | Final Construction Geology Report, Horsetooth Reservoir Dams Modification, Colorado-Big THompson Project, Colorado (Specifications no. DC-7734) | E.L. Wright | 8/90 |
I27.2/2:H78/11/DOC | Final Geologic Report on the South Bay Campground Sinkholes, Horsetooth Reservoir, Colorado-Big Thompson Project, Colorado | E.L. Wright G. Taucher |
3/91 |
I27.2/2:H78/12/DOC | Progress Report No. 3 : Special Geotechnical Investigation, Horsetooth Dam | J. Swaisgood | 11/91 |
I27.2/2:H78/13/DOC | Special Examination Report for Horsetooth Dams : Safety Evaluation of Existing Dams (SEED) Program, Colorado-Big Thompson Project, Colorado, Great Plains Region (SEED,Dam) | R.B. Campbell | 9/25/91 (rev. 5/29/92) |
I27.2/2:H78/14/DOC | Geologic Report SEED Investigations, Horsetooth Dam, Colorado-Big Thompson Project, Colorado (2 vol.) | G. Taucher L. Parish |
7/92 |
I27.2/2:H78/15/FINAL/DOC | Final Environmental Assessment for the Resource Management Plans for Horsetooth Reservoir, Carter Lake, Flatiron Reservoir and Pinewood Lake | EDAW, Inc. | 8/95 |
I27.2/2:H78/16/DOC | Resource Management Plan for Horsetooth Reservoir, Carter Lake, Flatiron Reservoir and Pinewood Lake | EDAW, Inc. | 8/95 |
I27.2/2:H78/17/DOC | Special Examination Report for Horsetooth Dam : Safety Evaluation of Existing Dams (SEED) Program, Colorado-Big Thompson Project, Colorado, Great Plains Region | J. Sharman | 9/7/95 |
I27.2/2:H78/18DOC | Examination Report : Comprehensive Facility Review for Horsetooth Reservoir Dams, Colorado-Big Thompson Project, Colorado, Great Plains Region | BUREC Technical Service Center | 11/96 |
I27.2/2:H78/19/DOC | Horsetooth Reservoir Dams, Report of Findings | L.W. Davidson | 10/97 |
I27.2/2:H78/20/DOC | Performance Parameters for Horsetooth Reservoir Dams (TM no. JT-8312-1) | Performance Parameters Team | 10/97 |
I27.2/2:H78/21/DOC | Consultant Review Rept. No. 1, Horsetooth Dam, CO (Woodward- Clyde Project D97245) | J.W. France F.W. Swartz |
4/15/98 |
I27.2/2:H78/22/DOC |
Decision Memorandum for Horsetooth Dam |
C. Redinger | 7/31/98 |
I27.2/2:H78/23/DOC | Accountability Report to the Independent Architect-Engineering (A-E) Consultant : Review and Assessment of Horsetooth Dam Foundation Conditions, Colorado-Big Thompson Project, Colorado | A. Kiene | 7/98 |
I27.2/2:H78/24/DOC | Preliminary Seismic Hazard Assessment For Rattlesnake, Flatiron, Horsetooth, Soldier Canyon, Dixon Canyon, Spring Canyon and Carter Lake Dams, Colorado-Big Thompson Project, Colorado | U.R. Vetter | 9/99 |
I27.2/2:H78/25-27/DOC |
Horsetooth Reservoir Dams – Consequences of a Dam Failure Horsetooth Dam – Colorado: Loss of Life Due to Dam Failure, June 2, 1999/ Blair P. Greimann Spring Canyon, Dixon Canyon, Soldier Canyon Dams – Colorado : Loss of Life Due to Dam Failure, May 20, 1999 / Blair P. Greimann Economic Consequences Of Dam Failure and Justifiable Expenditures : Safety of Dams Program, Horsetooth Dam, Colorado, November, 1998 / Earl Ekstrand |
B.P. Greimann E. Ekstrand |
1998/99 |
I27.2/2:H78/28/DOC |
Horsetooth Dam Water Chemistry Report, Summary of 1951-1998 chemistry and petrography data for reservoir, seeps, and groundwater from Horsetooth Dam, Colorado Big-Thompson Porject, Fort Collins, Colorado, May 28, 1999 (TM D-8290/99-001) |
D. Craft | 5/99 |
I27.2/2:H78/29/DOC | Geology and Safety of Dams Case Histories in Gypsum Karst for Horsetooth Dam and Reservoir and Carter Lake Dam No. 2, Colorado Big Thompson Project, Ft. Collins and Loveland, Colorado | R. Pearson | 5/27/99 |
I27.2/2:H78/30/DOC | Crosshole Seismic Tomography and Geophysical Borehole Logging, Horsetooth Dam, Colorado-Big Thompson Project, Colorado (TM no. D8330- 99-027) | L. Block | 11/99 |
I27.2/2:H78/31/DOC |
Decision Memorandum on Horsetooth Reservoir Dams Safety Issues Evaluation Results, Colorado-Big Thompson Project, Colorado |
BUREC, Eastern BUREC, Eastern | 1/11/00 |
I27.2/2:H78/32/DOC | Report of Chemical Analyses for Water Samples from Seeps and Piezometer Holes at Horsetooth Dam, Colorado-Big Thompson Project, Ft. Collins, Colorado (Ref. no. D8290111599.1) | D. Craft | 11/16/99 |
I27.2/2:H78/33/DOC | Petrographic Determination of Seepage Evidence in Selected Rock Fragments, Horsetooth Dam Area, Colorado-Big Thompson Porject, Colorado (No. 8340-99-32) | D.R. Hurcomb | 12/21/99 |
I27.2/2:H78/34/DOC | Decision Report: Horsetooth Reservoir | BUREC, Eastern | 1/12/00 |
I27.2/2:H78/35/DOC | Consultant Review Report no. 2, Horsetooth Reservoir Dams, Colorado (URS Greiner Woodword/Clyde Proj. 68-FUSBR164.00) | URS Greiner Woodward Clyde | 2/8/00 |
I27.2/2:H78/36/ DRAFT/DOC |
Horsetooth Reservoir, Safety of Dam Activities : Horsetooth Dam, Soldier Canyon Dam, Dixon Canyon Dam, and Spring Canyon Dam : Draft Environmental Assessment | BUREC, Eastern Colorado Area Office | 5/25/00 |
I27.2/2:H78/36/ FINAL/DOC |
Horsetooth Reservoir, Safety of Dams Activities : Horsetooth Dam, Soldier Canyon Dam, Dixon Canyon Dam, and Spring Canyon Dam : Final Environmental Assessment and Finding Of No Significant Impacts (FONSI) | BUREC, Eastern Colorado Area Office | 8/4/00 |
I27.2/2:H78/37/DOC |
Horsetooth Dam Water Chemistry Report. Summary of 1951-1998 Chemistry and Petrography Data for Reservoir, Seeps, and Groundwater From Horsetooth Dam, Colorado Big-Thompson Project, Ft. Collins, Colorado, May 28, 1999 Report of Chemical Analyses for Water Samples, Seeps and Piezometer Holes at Horsetooth Dam, Colorado Big-Thompson Project, Ft. Collins, Colorado November 16, 1999 |
Craft, Doug | 5/28-11/16/99 |
I27.2/2:H78/38/DOC | Horsetooth Reservoir Dams Materials Investigations | BUREC, Eastern Colorado Area Office | [2000] |
I27.2/2:H78/39/DOC | Horsetooth Dam Modifications : Evaluation of Roller Compacted Concrete Proposals, Colorado-Big Thompson Project, Colorado | Scott, Greg and others | 5/00 |
I27.2/2:H78/40/DOC | Crosshole Seismic Velocity Measurements and Geophysical Borehole Logging for Dixon Canyon, Soldier Canyon and Spring Canyon Dams, Big Thompson Project, Colorado | Schimschal, Ulrich | 5/00 |
I27.2/2:H78/41/DOC | Probabilistic Ground Motion Evaluation For Horsetooth, Canyon, Dixon, and Spring Canyon Dams, Colorado-Big Thompson Project, North-Central Colorado | Ake, Jon P. and Ute Vetter | 2/00 |
127.2/2:H78/42/DOC | Horsetooth, Soldier Canyon Dixon Canyon and Spring Canyon Dams, Colorado-Big Thompson Project, Colorado: Modification Report | BUREC, Great Plains Region | 8/00 |
127.2/2:H78/43/DOC |
Consultant review report no. 3: Horsetooth Reservoir Dams, Colorado |
|
9/18/00 |
127.2/2:H78/44/DOC | Geophysical Investigations Seismic Surveys and Borehole Logs, Horsetooth Dam, Colorado - Big Thompson Project, Colorado |
Schimschal, Ulrich | 6/01 |
127.2/2:H78/45/DOC | Geophysical Investigations Seismic Refraction Surveys and Downhole Surveys for Soldier Canyon, Dixon Canyon and Spring Canyon Dams, Big Thompson Project, Colorado | Schimschal, Ulrich | 6/01 |